BRISTOL LIFE SCIENCE UNIVERSITY
Bristol
This project was recently opened by everyone's favourite Sir David Attenborough. This 56 million pound project is an amazing link between old and new. Our scope of work involved the laying of 4000m2 yorkstone Paving laid on parex specialist bedding and pointed with Granatech 40. 1500m2 of granite block paving was laid along with 100m2 of original historical cobbles and 30 large recess manholes. Our work also included the laying of 300 linear metre of steps. As you can see by the photos this is a special job and one we at ‘Citypave Groundworks’ are very proud of.
CONTACT
Maritime House
Basin Road North
Hove
East Sussex
BN41 1WR
Phone: 07342 884175
EMAIL US
For all enquires email info@citypavegroundworks.co.uk